Vulcan Hart 00-715039 Salamander Broiler Tube Coupling W/Shutoff 3/16"CC

$11.32
In stock
SKU
00-715039
Manufacturer:
The Vulcan Hart 00-715039 Salamander Broiler Tube Coupling with Shutoff operates by connecting portions of the gas tube of the broiler and enabling the flow of gas to the burner by an internal shutoff system when the valve is open and preventing the flow of gas when the valve is closed. It has threaded connections and an internal shutoff valve that reacts to rotation to initiate or terminate passage of gas when in operation. It is fitted in the gas line assembly of salamander broilers where a 3/16" compression connection is needed.

Dimensions

  • Length: 1.5 In
  • Width: 0.25 In
  • Height: 0.25 In
  • Weight: 0.06 lbs
https://partsfe.com/media/catalog/product/v/u/vulcan-hart-00-715039-3-16-cc-tube-coupling-with-shutoff-85346-2.jpg

Product Notes

  • Pilot Coupling W/Shut-Off, 3/16" Cct X 3/16" Cct
Write Your Own Review
You're reviewing:Vulcan Hart 00-715039 Salamander Broiler Tube Coupling W/Shutoff 3/16"CC
Your Rating
Customer Questions
What maintenance is required for the Vulcan Hart 00-715039 Tube Coupling With/Shutoff?

Inspect the tube coupling for leaks and tightness regularly, especially at shutoff valve connections. Clean fittings to remove grease, debris, and mineral buildup to ensure proper sealing. Lubricate sealing components if applicable and verify shutoff operation during routine equipment checks.

What are common issues with the Vulcan Hart 00-715039 Tube Coupling With/Shutoff?

  • Leakage at connection points due to worn seals or improper tightening.
  • Shutoff valve sticking or failing to fully close.
  • Thread wear causing poor fit and pressure loss.
  • Corrosion or mineral buildup restricting flow.

We strive to provide our customers with a hassle-free and efficient shopping experience. Our shipping policy ensures the timely delivery of your orders and complete customer satisfaction. View More

We are committed to ensuring your complete satisfaction with every purchase. We understand that circumstances may arise where you must return a product or request a refund. If for any reason you are not satisfied, you may return the item(s) according to the terms outlined below. View More

This Payment Policy outlines the terms and conditions governing all payments made for products purchased through our website. By making a purchase, you agree to be bound by this Payment Policy. View More

Installation Steps

Step1: Turn off the gas or fluid supply and allow equipment to cool completely.

Step2: Remove the old coupling and clean the tube ends and connection points.

Step3: Align the new coupling with the tubing and insert securely into place.

Step4: Tighten fittings evenly using the proper tool; avoid overtightening.

Step5: Ensure the shutoff valve operates freely and is in the correct position.

Step6: Restore supply slowly and inspect carefully for leaks before operating equipment.