Step1: Turn off gas supply and ensure equipment is cool before starting installation.
Step2: Remove existing tubing and inspect inlet/outlet connections for damage or debris.
Step3: Attach breakaway fitting to designated gas connection point and tighten securely.
Step4: Connect stainless steel flex tube, ensuring correct alignment without twisting.
Step5: Use approved leak-detection solution on all joints after reconnecting gas.
Step6: Restore gas supply slowly and test for leaks and proper operation before use.