Step1: Disconnect power at source and check zero voltage using tester.
Step2: Measure and cut required wire length for application.
Step3: Strip insulation ends carefully without damaging conductor strands.
Step4: Connect wire to rated terminals or junction blocks securely.
Step5: Route wire away from sharp edges and high-heat surfaces.
Step6: Secure with clamps/ties and restore power for testing continuity and operates.
Step7: Wear insulated gloves and ensure equipment remains de-energized during handling.