Step1: Disconnect power supply and allow fryer to cool completely before servicing.
Step2: Remove existing temperature probe carefully from the mounting well and note wire positions.
Step3: Insert new probe into the well ensuring correct depth and secure alignment.
Step4: Reconnect leads to control board terminals firmly, matching original wiring configuration.
Step5: Restore power and test fryer temperature readings for accuracy before full operation.
Step6: Inspect installation area for leaks or loose fittings and ensure proper insulation.