Zurn PN400-5B-STR Drain Cover 5"

Special Price $38.07 Regular Price $43.85
In stock
SKU
PN400-5B-STR
Manufacturer:
The Zurn PN400-5B-STR Drain Cover 5" directs water and other liquids into the drain and does not allow larger objects to enter the piping system. It works by directing the liquid through the slotted holes, which enables it to pass downwards to the drain underneath. This cover is fitted to the floor, and it covers the drain opening such that the edges of the cover fit into the frame of the grate around it. The size and shape are made to fit in the standard 5-inch floor drains and fit in the existing drainage system.

Dimensions

  • Length: 5 In
  • Width: 5 In
  • Height: 1 In
  • Weight: 0.57 lbs
https://partsfe.com/media/catalog/product/z/u/zurn-pn400-5b-str-5-drain-cover-28000.jpg

Product Notes

  • 5" Floor Drain Cover.
  • Replaces Zurn 10-803860
Write Your Own Review
You're reviewing:Zurn PN400-5B-STR Drain Cover 5"
Your Rating
Customer Questions
No Questions

We strive to provide our customers with a hassle-free and efficient shopping experience. Our shipping policy ensures the timely delivery of your orders and complete customer satisfaction. View More

We are committed to ensuring your complete satisfaction with every purchase. We understand that circumstances may arise where you must return a product or request a refund. If for any reason you are not satisfied, you may return the item(s) according to the terms outlined below. View More

This Payment Policy outlines the terms and conditions governing all payments made for products purchased through our website. By making a purchase, you agree to be bound by this Payment Policy. View More

Installation Steps

Step1: Ensure the drain area of the appliance is clean before installation.

Step2: Remove any existing drain cover if present.

Step3: Clear debris from the drain opening thoroughly.

Step4: Position the new drain cover over the opening.

Step5: Align it properly with the frame.

Step6: Press or secure it into place as required.

Step7: Check that it sits flush and stable.

Step8: Ensure proper drainage flow after installation.