Groen Z076526 3/8" Mpt, Water Level Electrode Probe for NGB and Steamer, 1-7/8" Under Threaded, 3/4" Insulator

Special Price $55.62 Regular Price $79.46
In stock
SKU
Z076526
Water Level Electrode 3/8 Mpt

Dimensions

  • Length: 1 In
  • Width: 1 In
  • Height: 4 In
  • Weight: 0.11 lbs
https://partsfe.com/media/catalog/product/g/r/groen-z076526-3-8-mpt-water-level-electrode-probe-for-ngb-and-steamer-1-7-8-under-threaded-3-4-insulator-49940.jpg

Product Notes

  • Water Level Electrode Probe
  • 3/8" Mpt, 1-7/8" Under Threaded 3/8" Mpt To 1/4"
  • End, 3/4" Insulator, 6-32 Threaded Electrical Top With Nuts
  • Groen Boiler Ngb
  • Steamer Hy-5E, Hy-3E, Hy-6G
Write Your Own Review
You're reviewing:Groen Z076526 3/8" Mpt, Water Level Electrode Probe for NGB and Steamer, 1-7/8" Under Threaded, 3/4" Insulator
Your Rating
Customer Questions
What maintenance is required for the Groen Z076526 Water Level Electrode Probe?

Regularly inspect the probe for mineral scale buildup and clean with a non-abrasive descaler to maintain accurate water level sensing. Ensure electrical connections remain tight and corrosion-free. Rinse after service and verify insulation integrity to prevent signal drift and safety issues.

What are common issues with the Groen Z076526 Water Level Electrode Probe?

  • Mineral scale buildup causing false readings.
  • Loose or corroded electrical connections.
  • Insulation degradation leading to signal loss.
  • Intermittent water level detection errors.

We strive to provide our customers with a hassle-free and efficient shopping experience. Our shipping policy ensures the timely delivery of your orders and complete customer satisfaction. View More

We are committed to ensuring your complete satisfaction with every purchase. We understand that circumstances may arise where you must return a product or request a refund. If for any reason you are not satisfied, you may return the item(s) according to the terms outlined below. View More

This Payment Policy outlines the terms and conditions governing all payments made for products purchased through our website. By making a purchase, you agree to be bound by this Payment Policy. View More

Installation Steps

Step1: Turn off appliance power for safety.

Step2: Remove old probe and clean mounting threads to ensure proper sealing.

Step3: Thread the new electrode probe into the water level port and tighten securely.

Step4: Reconnect electrical leads according to manufacturer wiring diagram, ensuring firm connections.

Step5: Restore power and test water level operation for correct cycling and leaks.