Step1: Turn off gas supply and disconnect power to fryer before starting.
Step2: Remove old safety valve and clean mounting surface thoroughly.
Step3: Apply thread sealant and align new valve to inlet/outlet orientation, ensure correct positioning.
Step4: Secure FPT connections and tighten fittings properly, hand-tight first then secure.
Step5: Restore gas, check for leaks using soapy water after installation.
Step6: Test ignition and ensure stable flame operation, confirm stable flame operation.