Step1: Shut off the incoming water supply and relieve pressure from the line before servicing.
Step2: Remove the existing pressure reducing valve and inspect the piping for debris or damage.
Step3: Clean the pipe threads and apply an approved thread sealant if required.
Step4: Install the new valve, ensuring the flow-direction arrow points toward the equipment.
Step5: Tighten all connections securely without overtightening.
Step6: Slowly restore the water supply and inspect for leaks.
Step7: Verify outlet pressure is set correctly and test equipment operation to confirm proper water flow and pressure regulation.