Step1: Shut off gas supply and ensure area is well ventilated before beginning installation.
Step2: Inspect hose, fittings, and swivel ends for damage or debris.
Step3: Apply gas-rated thread sealant and connect male swivel ends to appliance and gas line.
Step4: Tighten all connections securely with wrench without over-tightening or damaging threads.
Step5: Perform soap solution leak test at all joints to confirm safety.
Step6: Restore gas supply and test appliance operation while monitoring for leaks.