Step1: Disconnect power and secure equipment using lockout/tagout procedures to prevent accidental movement.
Step2: Remove existing hinge pin receptacle and thoroughly clean mounting surface of debris.
Step3: Align new double hinge pin receptacle with hinge points and accurately mark drill holes.
Step4: Fasten securely using manufacturer-approved screws/bolts, tightening to recommended torque.
Step5: Reattach door/panel, test alignment and smooth movement; ensure electrical safety before restoring power and operation.