Pitco B7510006 Fryer Conversion Kit

Special Price $340.95 Regular Price $668.00
In stock
SKU
B7510006
Manufacturer:
The Pitco B7510006 Fryer Conversion Kit is a kit is used to convert natural gas to propane to increase flexibility in the kitchen. This kit contains some parts like red cap, adjustment screw, spring LP and a conversion sticker that makes installation easy. The kit also helps in the flexibility of choice of fuel to be used since propane is used in cases where natural gas is not available. This conversion also makes it easier to achieve the better results from the operation of fryers, to achieve uniform temperatures, and enhance the quality of the food and the productivity of operations.

Dimensions

  • Length: 2.25 In
  • Width: 2 In
  • Height: 2.5 In
  • Weight: 0.2 lbs
https://partsfe.com/media/catalog/product/p/i/pitco-b7510006-fryer-conversion-kit-82562-2.jpg

Product Notes

  • Nat To Lp Conversion Kit
  • Red Cap, Adj Screw, Spring For Lp, Conversion Sticker, For
  • Use On 700 Series Valves
  • 6Ea #55 Burner Orifices And Lp Pilot Orifice
Write Your Own Review
You're reviewing:Pitco B7510006 Fryer Conversion Kit
Your Rating
Customer Questions
What maintenance is required for the Pitco B7510006 Conversion Kit?

Inspect fryer all gas fittings and connections regularly to ensure there are no leaks or loose components. Check conversion components for damage, corrosion, or damage after placement. Ensure proper calibration of gas settings for better operation. Regular inspection assists in maintaining consistent appliance performance and safety.

What are common issues with the Pitco B7510006 Conversion Kit?

  • Gas leaks at connection points.
  • Improper fuel conversion causing performance issues.
  • Inconsistent burner ignition after placed.
  • Component mismatch with fryer model.
  • Loose fittings leading to unstable operation.
  • Reduced heating efficiency after conversion.

We strive to provide our customers with a hassle-free and efficient shopping experience. Our shipping policy ensures the timely delivery of your orders and complete customer satisfaction. View More

We are committed to ensuring your complete satisfaction with every purchase. We understand that circumstances may arise where you must return a product or request a refund. If for any reason you are not satisfied, you may return the item(s) according to the terms outlined below. View More

This Payment Policy outlines the terms and conditions governing all payments made for products purchased through our website. By making a purchase, you agree to be bound by this Payment Policy. View More

Installation Steps

Step1: Shut off the power and gas supply before beginning the conversion.

Step2: Access the burner and gas control components required for replacement.

Step3: Remove the existing conversion-related parts from the equipment.

Step4: Install the components included in the conversion kit in their proper positions.

Step5: Verify all fittings, connections, and adjustments are correctly set.

Step6: Restore utilities and test the equipment for proper operation and performance.