Step1: Turn off and unplug equipment from main power supply to ensure complete isolation.
Step2: Mount transformer securely on designated surface and verify voltage compatibility per manual guidelines.
Step3: Connect SVO connector and attach 18 AWG leads to matching terminals following wiring diagram.
Step4: Tighten all terminals, insulate connections using appropriate tools, and check for secure fit.
Step5: Restore power and test operation, monitoring for proper operation and abnormal heat.
Step6: Ensure no exposed wires, wear PPE gloves and follow electrical safety standards.