Southbend 5162-2 1/8" FPT Solenoid Valve, 240V, 60/50HZ

Special Price $297.73 Regular Price $580.38
In stock
SKU
5162-2
Manufacturer:
Solenoid Valve-240V

Dimensions

  • Length: 2.06 In
  • Width: 1.06 In
  • Height: 1.63 In
  • Weight: 0.33 lbs
https://partsfe.com/media/catalog/product/s/o/southbend-5162-2-1-8-fpt-solenoid-valve-240v-60-50hz-12541-2.jpg

Product Notes

  • Asco Solenoid Valve
  • 240/220V, 60/50Hz, 1/8" Fpt In/Out, 6.3Watt
  • Blodgett Counter Convection Steamer Sn-3E, Sn-4E, Sn-5E
Write Your Own Review
You're reviewing:Southbend 5162-2 1/8" FPT Solenoid Valve, 240V, 60/50HZ
Your Rating
Customer Questions
What maintenance is required for the Southbend 5162-2 Solenoid Valve?

Check the valve for smooth operation and clean debris from the internal mechanism. Inspect wiring and connectors, and turn off power before maintenance.

What are common issues with the Southbend 5162-2 Solenoid Valve?

  • Valve fails to open or close.
  • Corroded or loose terminals.
  • Blocked or stuck plunger.
  • Leakage around seals.

We strive to provide our customers with a hassle-free and efficient shopping experience. Our shipping policy ensures the timely delivery of your orders and complete customer satisfaction. View More

We are committed to ensuring your complete satisfaction with every purchase. We understand that circumstances may arise where you must return a product or request a refund. If for any reason you are not satisfied, you may return the item(s) according to the terms outlined below. View More

This Payment Policy outlines the terms and conditions governing all payments made for products purchased through our website. By making a purchase, you agree to be bound by this Payment Policy. View More

Installation Steps

Step1: Turn off power and water supply before starting.

Step2: Remove the old solenoid valve, noting wire and pipe connections.

Step3: Position the new solenoid valve in place, aligning inlet and outlet ports.

Step4: Connect water lines securely and tighten fittings to prevent leaks.

Step5: Attach electrical wires to the valve terminals as labeled.

Step6: Restore water supply and power, then test for proper operation.