Step1: Disconnect power supply and verify circuit compatibility before installation.
Step2: Position unit securely and fasten to designated mounting area, and level unit.
Step3: Connect electrical wiring according to manufacturer's schematic diagram and local codes.
Step4: Ensure proper grounding for safe operation at all times.
Step5: Check all connections are tight, secure, and properly insulated.
Step6: Restore power and test unit operation under supervision.
Step7: Perform final safety inspection and compliance check before use.