Step1: Turn off main water supply and relieve system pressure before starting.
Step2: Clean mounting surface thoroughly and verify inlet size compatibility and condition.
Step3: Position faucet body correctly and align all mounting holes carefully.
Step4: Secure faucet using provided hardware, tightening evenly to avoid leaks.
Step5: Connect water lines using thread seal tape for secure, leak-free joints.
Step6: Turn on water supply slowly and inspect all connections for leaks.
Step7: Test faucet flow, ensure stable mounting, and verify safe operation.