Step1: Disconnect power and ensure the range is cool before servicing, after isolating circuit breaker.
Step2: Remove existing top surface heater and clean mounting area thoroughly of debris or grease.
Step3: Align new heater with mounting points and secure firmly using manufacturer-approved fasteners.
Step4: Reconnect wiring terminals per diagram, ensure tight connections, and verify insulation is intact.
Step5: Restore power and test for even heating and proper operation, monitoring for abnormalities.