Step1: Disconnect power supply and confirm equipment is fully de-energized and cooled before servicing.
Step2: Remove access panel and detach existing quartz element noting terminal positions and wiring layout.
Step3: Clean mounting channels and sockets thoroughly to remove dust, oxidation, or residue buildup.
Step4: Position new element securely into brackets ensuring proper alignment.
Step5: Reconnect electrical leads firmly to original terminals and avoid strain on wires.
Step6: Reassemble unit restore power and test heating cycle gradually to confirm uniform radiant heat and better operation.