Step1: Shut off gas supply and electrical power before installation.
Step2: Remove existing valve and clean fittings, inspect for damage.
Step3: Apply gas-rated thread sealant to threads, use approved material.
Step4: Install valve aligning inlet/outlet ports and tighten securely with proper tools.
Step5: Reconnect electrical connections per wiring diagram carefully.
Step6: Restore gas and check all joints for leaks using soap solution; avoid flames.
Step7: Test grill ignition and ensure proper safe operation.