Vulcan Hart 944360-L000A Pilot Tube Assembly Left

$43.90
In stock
SKU
944360-L000A
Manufacturer:
The Vulcan Hart 944360-L000A Pilot Assembly Left senses to control the flow of gas to the burner and keeps a pilot flame alive with the inbuilt sensing and valve units. When the pilot flame has been lit, the thermocouple or sensor in the assembly will sense the presence of the flame and flow of gas to the main burner system will be allowed to continue. It is fitted on the left side of the burner box of the cooking appliance, and a special pilot flame is required.

Dimensions

  • Length: 6.5 In
  • Width: 2 In
  • Height: 1.5 In
  • Weight: 0.05 lbs
https://partsfe.com/media/catalog/product/v/u/vulcan-hart-944360-l000a-left-pilot-assembly-54515-2.jpg
Manufacturer Name: Vulcan
Product Number: 944360-L000A
OEM Part Number: 944360-L000A
Product Description: Pilot Assembly - Left
Similar Models:00-944360-L000A - Vulcan-Hart, 944360-LA - Vulcan-Hart
Dimensions:
Length:6.5in/16.51cm
Width:2in/5.08cm
Height:1.5in/3.81cm
Weight:0.05lbs/22.68g

Choose the best Commercial kitchen & Restaurant equipment parts and supplies from PartsFe!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at 866-863-0907 or contact@partsfe.com

Write Your Own Review
You're reviewing:Vulcan Hart 944360-L000A Pilot Tube Assembly Left
Your Rating
Customer Questions
What is the Best Electric Griddle?

Electric Griddle is an electronic equipment that uses an electric element as its heat source. It has a large cooking surface often made up of nonstick material. Electric Griddle has a surface which you do not find in the regular stovetop cookware. ...

What maintenance is required for the Vulcan Hart 944360-L000A Pilot Assembly?

Inspect the pilot assembly regularly for blockages, dirt, or grease that can affect flame performance. Ensure the gas pathway is clear and connections are secure. Clean gently to maintain proper ignition. Always turn off gas supply before servicing.

What are common issues with the Vulcan Hart 944360-L000A Pilot Assembly?

  • Pilot failing to ignite or stay lit.
  • Weak or inconsistent pilot flame.
  • Blocked pilot tube restricting gas flow.
  • Gas supply interruptions to pilot.
  • Misalignment affecting ignition performance.
  • Carbon buildup interfering with operation.

We strive to provide our customers with a hassle-free and efficient shopping experience. Our shipping policy ensures the timely delivery of your orders and complete customer satisfaction. View More

We are committed to ensuring your complete satisfaction with every purchase. We understand that circumstances may arise where you must return a product or request a refund. If for any reason you are not satisfied, you may return the item(s) according to the terms outlined below. View More

This Payment Policy outlines the terms and conditions governing all payments made for products purchased through our website. By making a purchase, you agree to be bound by this Payment Policy. View More

Installation Steps

Step1: Shut off gas and electrical power, and allow unit to fully cool before servicing.

Step2: Remove access panel and carefully disconnect existing pilot assembly, including gas line and ignition wiring.

Step3: Install new left pilot assembly in correct position, securing mounting brackets firmly.

Step4: Reconnect gas line and ignition leads, ensuring all connections are tight and properly aligned.

Step5: Restore gas supply, test ignition sequence, verify stable flame, and perform leak check.