Vulcan Hart 944360-LA Pilot Tube Assembly Left

$43.90
In stock
SKU
944360-LA
Manufacturer:
The Vulcan Hart 944360-LA Pilot Tube Assembly Left regulates the flow of gas to the burner by sensing and maintaining a pilot flame with its built-in valve and sensing elements. When the pilot is illuminated the thermocouple or flame sensor activates the gas valve to stay open so that the main burner can be ignited. It is mounted on the left side of the burner area in compatible cooking equipment. This left pilot assembly is intended to be used in commercial ranges and ovens that have a need for a left-positioned pilot system.

Dimensions

  • Length: 6.5 In
  • Width: 2 In
  • Height: 1.5 In
  • Weight: 0.05 lbs
https://partsfe.com/media/catalog/product/v/u/vulcan-hart-944360-la-left-pilot-assembly-10385-2.jpg
Manufacturer Name: Vulcan
Product Number: 944360-LA
OEM Part Number: 944360-LA
Product Description: Pilot Assembly - Left
Similar Models:00-944360-L000A - Vulcan-Hart, 944360-L000A - Vulcan-Hart
Dimensions:
Length:6.5in/16.51cm
Width:2in/5.08cm
Height:1.5in/3.81cm
Weight:0.05lbs/22.68g

Choose the best Commercial kitchen & Restaurant equipment parts and supplies from PartsFe!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at 866-863-0907 or contact@partsfe.com

Write Your Own Review
You're reviewing:Vulcan Hart 944360-LA Pilot Tube Assembly Left
Your Rating
Customer Questions
What is the Best Electric Griddle?

Electric Griddle is an electronic equipment that uses an electric element as its heat source. It has a large cooking surface often made up of nonstick material. Electric Griddle has a surface which you do not find in the regular stovetop cookware. ...

What maintenance is required for the Vulcan Hart 944360-LA Pilot Assembly?

Regularly check the pilot assembly for dust, grease, or obstructions that can affect flame quality. Gently clean the pilot tip and surrounding area. Verify proper positioning and secure fittings. Always shut off gas and allow cooling before servicing.

What are common issues with the Vulcan Hart 944360-LA Pilot Assembly?

  • Pilot flame going out unexpectedly.
  • Delayed or failed ignition.
  • Irregular or flickering pilot flame.
  • Gas flow inconsistency to the pilot.
  • Clogged pilot opening.
  • Improper alignment affecting burner ignition.

We strive to provide our customers with a hassle-free and efficient shopping experience. Our shipping policy ensures the timely delivery of your orders and complete customer satisfaction. View More

We are committed to ensuring your complete satisfaction with every purchase. We understand that circumstances may arise where you must return a product or request a refund. If for any reason you are not satisfied, you may return the item(s) according to the terms outlined below. View More

This Payment Policy outlines the terms and conditions governing all payments made for products purchased through our website. By making a purchase, you agree to be bound by this Payment Policy. View More

Installation Steps

Step1: Shut off gas and electrical power, and allow equipment to cool completely before starting.

Step2: Remove access panel and detach existing pilot assembly, carefully disconnecting gas line and ignition components.

Step3: Install new pilot assembly in correct left pilot position, securing all mounting points firmly.

Step4: Reconnect gas line and ignition wiring, ensuring proper alignment and tight, leak-free connections.

Step5: Restore gas supply, initiate ignition test, verify steady flame, and confirm better operation with leak check.