Step1: Turn off power and disconnect equipment before starting installation.
Step2: Remove existing temperature control and label wiring connections carefully.
Step3: Mount securely in control panel and ensure proper fit.
Step4: Reconnect wires to matching terminals according to wiring diagram.
Step5: Tighten connections and verify potentiometer alignment and calibration.
Step6: Restore power and test temperature response for safe operation.
Step7: Confirm all safety checks and monitor initial startup for stability.