Step1: Shut off main gas supply and disconnect electrical power before starting installation.
Step2: Remove old fryer valve assembly and thoroughly clean inlet/outlet threads.
Step3: Apply approved gas-rated sealant and securely mount the new valve correctly.
Step4: Connect 3/4" FPT inlet/outlet lines securely; avoid over-tightening fittings.
Step5: Wire 120 VAC actuator according to manufacturer wiring diagram.
Step6: Restore gas supply, check for leaks using approved solution, and test operation safely.