Step1: Turn off and lock out power supply before installation, and verify circuit is de-energized.
Step2: Position vertical mount on designated panel area and mark mounting points.
Step3: Align shaft/actuator and secure with provided hardware ensuring correct orientation.
Step4: Connect auxiliary switch wiring per schematic, maintaining proper insulation and routing.
Step5: Tighten all fasteners and ensure alignment and smooth movement.
Step6: Restore power and test switch for correct operation .