Step1: Turn off main power supply and verify circuit is fully de-energized before starting.
Step2: Remove existing mount and clean installation surface free of debris and dust.
Step3: Position vertical mount and align 3/16" hardware holes carefully with bracket points.
Step4: Secure mount with fasteners and tighten evenly to manufacturer specifications.
Step5: Connect auxiliary switch wiring per schematic, ensure insulation and secure terminals.
Step6: Restore power and test switch operation and stability under load conditions.